• Ease of Doing Business

    • 190 Economies around the world are ranked by the World Bank on ten parameters wherein, ‘Getting Electricity’ is also one of the parameters.
    • There are four parameters considered in evaluating ‘Getting Electricity’ for an electricity connection which impact a 140KW / 150 KVA connection on 415V supply are as follows:
      • Time taken to get electricity connection.
      • Cost required for getting a new connection.
      • Procedures required to be completed for getting new connection.
      • Reliability of electricity supply.
    • The concerted efforts of Ministry of Power, Central Electricity Authority, Government of Maharashtra and the DISCOMS – TATA Power-DDL and BEST, have contributed in raising India’s rank in ‘Getting Electricity’ from 137th rank in 2015 to 24th rank in 2018.
    • Many reforms have been undertaken in Delhi, which has contributed to the improvements in rankings:

    CENTRAL ELECTRICITY AUTHORITY:

    DELHI ELECTRICITY REGULATORY COMMISSION:

    Note: * where connection is feasible from existing distribution system, and no RoW/Road cutting permission is required.

    DELHI GOVERNMENT:

    • Online approval mechanism for Right of Way (RoW) from PWD

    TATA POWER DELHI DISTRIBUTION LIMITED:

    • Online facility provided to the consumer for registration of new electricity connection and submission of Documents. Please Click Here.
    • New Connection Demand Note payment through online channels. Please Click Here.
    • Procedure for obtaining a New Connection have been reduced to 3:
      • Online submission of application to utility & site inspection conducted.
      • Load sanction & demand note generation
      • Utility conducts external inspection and meter installation
    • Implementation of Outage Management System, and Supervisory Control and Data Acquisition system (SCADA) for improved reliability.
    • Launch of Mobile Application with real-time status tracking against Notifications. Please  Click Here.